The Shenzhen Metro announced that as of January 31st, due to the new pneumonia epidemic prevention and control situation, combined with the adjustment of the Spring Festival holiday and the schedule of resumption of work in our province, from January 31 to February 7, 2020, all lines of the Shenzhen Metro network will maintain the following operating hours: 06:30-23: 00 (line 11 is 6: 30-23: 30).

During this period, the wait time between trains on the entire network will be adjusted to 8-12 minutes. Shenzhen Metro will continue to pay attention to changes in passenger flow on all lines, and increase capacity at any time to protect citizens' travel needs.

Source: 你的背影,真美!

 

Events Calendar